Bronkhorst FLOW-BUS interface Manuale Utente Pagina 6

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 5
BRONKHORST®
1.4 SHORTFORMSTARTUP
AllnecessarysettingsforthismodulearealreadyperformedatBronkhorst.Followingthenextstepscarefullyisthe
quickestwaytogetthismoduleoperationalinyourownFLOWBUSenvironment.
START
Connect
Instrument
Makeoperational
Connectinstrument tothebus
Makeinstrumentoperationalonthebus (giveitaFLOWBUSnodeaddress)
Linktooperatormodule
Check
Ready
Factoryconfig
ured:
Complete FLOWBUS systems are already factory configured and tested and will be
directlyoperationalonthebu
s.However,changesinthesystemoraddingnewmodules
couldneednew(free)addressesontheFLOWBUS.
ByLED’sandswitch:
Watch the LED’s on top of the instrument when the instrument powersup.
If the green LED is burning continuously and the red LED is off, ever
ything is o.k. the
instrument is operational on the bus. If the red LED is blinking slowly, the FLOWBUS
address is already occupied. In that case: press the micro pushbutton and release it
after 2 seconds. Now the instrument is operational on the bus (pressing the push
button for 1 to 4 seconds will activate th
e auto install function, the instrument will
installitselftoafreenodeaddress).
Seta
ddressbytherotaryswitchesonthesideoftheinstrument(ifpresent).
Byrotaryswitch:
Makelinktoop
eratormodule(searchmoduleonthebuswiththeoperator).
Youcansearchforthisinstrument,lookingfortypeandserialnumber.
WithE7000modulefordigitalinstruments:
GototheFLOWBUSmenuandselect“OPERATEINSTR.”.Use<‐or‐>keystosearch
thebu
sforthewantedinstrument.Instrumentscanbeidentifiedbytheirserial
number.AlsobothLED’sontheinstrumentwillblinkturnbyturn(wink)forsome
seconds.Whenfound,pressmiddlekey(enter)tomakeconnectionforoperation.
WithPCsoftwareapplication:
WhenyouuseFLOWDDEorFLOWBUS.DLL(forWin
dowsapplications)allmodules
connectedtoFLOWBUSwillberecognisedautomatically.Theywillbeassignedtoa
channelforoperation.(seeFLOWDDEconfigurationmenu)Otherprogramswill
havetogetproceduresforreadingidentificationofinstruments.Fordetails,see
FLOWBUSsoftwaredocumentation.
Send a setpoint to the instrument and chec
k the measured value. Let the instrument
warmup for 30 minutes for best accuracy. Your Mass Flow Meter/Controller is now
readyforoperation.
Page6
FLOWBUSinterface9.17.024
Vedere la pagina 5
1 2 3 4 5 6 7 8 9 10 11 ... 25 26

Commenti su questo manuale

Nessun commento